How we build · About fourteen months
How a house gets built.
Six steps from the first walk on your land to the keys, and a phone number that still works in year twenty.
- 01 · Week 1First visit
We walk your land with you, free, and tell you honestly what it will take: the slope, the water, the septic, the view.
- 02 · Weeks 2 – 10Drawings
Dana draws the house with you at the shop table, or we work from your architect's plans.
- 03 · Week 11A fixed price
One number, line by line, before anything is built. It changes only if you change the house.
- 04 · Weeks 12 – 20Permits
We file with Lewis or Thurston County and answer every question they ask.
- 05 · About 50 weeksThe build
Foundation to final coat. Photos and a short film every Friday, and an open site on Saturdays.
- 06 · After the keysYear one, year twenty
We come back at month eleven to fix what the first winter found. Ten-year structural warranty, and the same phone number.


What it costs
Most of our houses land between $420 and $560 a square foot, before land, well and septic. We tell you where yours will sit at the first visit, and the fixed price in week eleven is the price you pay.
Built for the rain
Rainscreen walls, deep eaves, standing-seam roofs and a crawlspace you can stand up in. Lewis County gets fifty inches a year; the house should not notice it.