Roof replacement · Chehalis and Centralia
New roofs in two or three days.
Architectural shingle or standing-seam metal. Full tear-off, new underlayment, ridge vent and a magnet sweep of the yard, by one crew from start to finish.

What's included.
Everything that goes into a Steepline re-roof, from the deck up, and how long each part takes.
- 2–3days
Tear-off to cleanup
Most homes are stripped, dried in and roofed in two or three days, weather allowing.
- 100%
Deck walked and checked
Every sheet of decking is checked underfoot. Soft or delaminated boards are replaced and photographed before anything goes over.
- 2layers
Underlayment that sheds water
Synthetic underlayment over the whole deck, plus ice-and-water membrane in valleys, at eaves and around every pipe.
- 1:150
Balanced attic venting
Vent area sized to the attic floor, ridge to soffit, so winter condensation has somewhere to go.
- 2sweeps
Magnet sweep, twice
Yard, beds and driveway get a rolling magnet at the end of each day and again when we finish.
- 25yr
Workmanship warranty
Our own 25-year warranty on the labour, in writing, on top of the maker's shingle or panel warranty.
Jobs nearby.
Recent roof replacement jobs around Chehalis and Centralia, with the town and the year.

New decking, then underlaymentNapavine · 2025 
Dormer re-roofAdna · 2025 
Ridge cap going onChehalis · 2024
Full tear-off on our 1962 rambler. Crew of five, done in two days, and they ran the magnet over the lawn twice. Not one nail in the driveway.
Mark & Lisa T. · Chehalis · Roof replacement
Written quote in 48h.
Text us a picture of the problem, or book a free inspection and we'll come and look. No sales visit unless you ask for one.